View cars list

Bugatti Mistral

Class S

CAR STATUS

Activating it costs 20 (24 h) or 105 (7 days)

SPEED
Bugatti Mistral

BLUEPRINTS

85 / 25 / 29 / 38 / 54 / 69 (300)

Epic Parts: 16

UPGRADE & PART COSTS

42,486,000

MAX STATS MAX
  • SPEED KMH 452.60
  • ACCELERATION 80.84
  • HANDLING 56.32
  • NITRO 46.78
MAX SPEED
  • NORMAL, EXPLOSIVE, PERFECT, NITRO BOOST 484.0
  • AIR 589.0
LEVEL RANGE
  • STOCK 3,041
  • 3,278
  • 3,558
  • 3,856
  • 4,163
  • 4,522
  • 4,859
  • MÁX SIN EIP 4,539

DETAILS

STATS STOCK MÁX SIN EIP
RANGE 3,041 3,278 3,558 3,856 4,163 4,522 4,859 4,539
SPEED KMH 420.00 425.20 431.30 437.70 444.30 451.50 459.80 452.60
ACCELERATION 77.50 78.03 78.65 79.32 80.03 80.89 81.56 80.84
HANDLING 50.12 51.11 52.27 53.51 54.84 56.44 57.68 56.32
NITRO 30.00 32.64 35.77 39.10 42.46 46.15 50.42 46.78
PARTS
UNCOMMON 3 | 3 | 3 | 3 4 | 4 | 4 | 4 6 | 6 | 6 | 6 7 | 6 | 6 | 7 7 | 6 | 6 | 7 7 | 7 | 7 | 7 7 | 7 | 7 | 7
RARE 0 | 0 | 0 | 0 1 | 1 | 1 | 1 2 | 2 | 2 | 2 2 | 3 | 3 | 2 3 | 5 | 5 | 3 5 | 5 | 5 | 5 5 | 5 | 5 | 5
EPIC 0 | 0 | 0 | 0 0 | 0 | 0 | 0 0 | 0 | 0 | 0 1 | 1 | 1 | 1 2 | 2 | 2 | 2 4 | 4 | 4 | 4 0 | 0 | 0 | 0
COSTS STOCK MÁX SIN EIP
UPGRADES +482,000 +1,608,000 +2,446,000 +4,794,000 +9,396,000 +9,000,000 27,726,000
PARTS +1,080,000 +1,080,000 +1,440,000 +2,700,000 +3,240,000 +5,220,000 6,120,000
PER STAR +1,562,000 +2,688,000 +3,886,000 +7,494,000 +12,636,000 +14,220,000 33,846,000
CUMULATIVE 1,562,000 4,250,000 8,136,000 15,630,000 28,266,000 42,486,000 33,846,000
GARAGE VALUE STOCK MÁX SIN EIP
PER STAR +102,996 +73,402 +92,060 +146,249 +231,407 +276,866 738,484
CUMULATIVE 102,996 176,398 268,458 414,707 646,114 922,980 738,484

UPGRADES & COSTS

UPGRADES PER STAGES
  1. 1 23,000
  2. 2 37,500
  3. 3 60,000
  4. 4 90,000
  5. 5 130,000
  6. 6 182,000
  7. 7 255,000
  8. 8 356,500
  9. 9 499,500
  10. 10 699,000
  11. 11 979,000
  12. 12 1,370,000
  13. 13 2,250,000

Each stage is paid 4 times, once per feature.

PARTS
  • 28 UNCOMMON × 90,000 = 2,520,000
  • 20 RARE × 180,000 = 3,600,000
  • 16 EPIC × 540,000 = 8,640,000
Total costs
  • UPGRADES 27,726,000
  • PARTS 14,760,000
  • TOTAL 42,486,000